Overview Quick Details
Place of Origin:
Guangdong, China
Brand Name:
DGHY
Model Number:
flexible shaft coupling
Material:
brass
Standard or Nonstandard:
Nonstandard
Structure:
Disc
Flexible or Rigid:
Flexible
Item:
brass propeller flexible shaft coupling
Lead time:
Sample: 3-5 day; Production: 10-20 days.
Application:
kinds of machine
Feature:
High Stability
Advantage:
quick connect fitting
Size:
Customized Size
Tolerance:
+/-0.01mm
Payment Terms:
30% desposite, 70% before shipping
Quality Control:
100% inspection before shipping
Shipment Terms:
Express /Air freight /Sea freight
Supply Ability
Supply Ability:
10000 Piece/Pieces per Month flexible shaft coupling
Packaging & Delivery
Packaging Details
carton and wooden box with pallet or according to the contract
Port
FOB Shenzhen for cnc turning drawing parts
Lead Time :
Quantity(Pieces) |
1 – 50 |
>50 |
Est. Time(days) |
10 |
To be negotiated |
cnc lathe machining parts brass propeller flexible shaft coupling
1-Thesepartsarecustommadeonly,notinstock;Wecanproducebasedonyourdrawingsorsamples.
2-These Flexible Couplings are replaceable with KTR GS Couplings. The R+W coupling, same quality, but our prices are much reasonable.
3-Can be used for little torque and shaft-joint.
4-Tighten the slot with screw to hold the shaft.
5-Zero backlash, no maintenance needed, resistant to oil and cauterization.
Available Material (metals) |
Available Material (plastic) |
Alloy (aluminum, zinc, magnesium, titanium) |
ABS, PC,ABS, PMMA (acrylic), Delrin,POM |
Brass, bronze, beryllium, copper |
PA (nylon), PP, PE, TPO |
Carbon steel, stainless steel, SPCC |
Fiberglass reinforced plastics,Teflon |
Processes |
Surface treatment (finish) |
CNC machining(Milling/Turning), Grinding |
High polish, brush, sand blast, anodization |
Sheet metal stamping, bending, welding, assembly |
plating (nickel, chrome),powder coat, |
Punching, Deep drawing, Spinning |
Lacquer painting, , silk screen, pad printing |
Equipment |
Quality control |
CNC machining centers (FANUC, MAKINO) |
CMM (3D coordinate measuring machine), 2.5D projector |
CNC turning centers/ Lathes / Grinders |
Thread gauge, hardness, caliber. A closed-loop QC system |
Punching, Spinning and Hydraulic tensile machines |
Third party inspection available if required |
Lead time & Packing |
Application |
7~15 days for sample, 15~25 days for production |
Automotive industry / Aerospace/ Telecom equipment |
3~5 days via express: DHL, FedEx, UPS, TNT, etc. |
Medical / Marine / Construction / Lighting system |
Standard export carton with pallet. |
Industrial Equipment & Components, etc. |